Want to enjoy exclusive offers from Globe?
Break Barriers with a Strong Connection
Experience first-world connectivity with a 14,500 kilometer-long Southeast Asia-United States (SEA-US) cable system stretched along a unique route designed and engineered to bypass earthquake-prone areas.
Business Continuity
Utilize our South Pacific route to bypass the earthquake-prone zone of Taiwan and Japan. (All previous cables exiting the country pass through these countries and the ring of fire.)
Efficient Routing
Provide additional redundancy to your network with the only Cable Landing Station (CLS) in Mindanao.
Data Center Colocation
Lessen the need for local connectivity from CLS to Data Center with the only CLS in the country having a colocated Data Center within its premises.
Lowest Latency
Get mission-critical activities done faster with low latency from the Philippines to the mainland U.S.A.
YOU MAY BE INTERESTED IN
Stay Updated
Get to know the industry's best practices and business solutions from The Business Advisor.